From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 12:04 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Daniel Deakins 

Last updated:  02/02/16

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Tucson, AZ  85743
US

Mobile: 520.400.1197   
ddd98201@gmail.com
Contact Preference:  Mobile Phone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Daniel Deakins - Primavera P6 Scheduler

Resume Value: 4zttihcahpunynat   

  

 

Daniel Deakins

520-400-1197

7604 W Talavera Way

Tucson, AZ 85743

ddd98201@gmail.com.

 

OBJECTIVE

·   Primavera P6 schedule development, updating, monitoring, and control.

·   Projects requiring best practices / EVMS / Primavera experience.

·   Focus: Engineering, Fossil Generating Plant Outages, T&D, Turnarounds, Engineering, Fed Gov.

EDUCATION

·   Graduate Certificate in Project Management: City University - Bellevue, WA

·   BS in Business Administration: Portland State University - Portland, OR

 

OVERVIEW

·   Academic training in Project Management at Masters Degree level; upward trending experience.

·   Total scheduling experience 12 years. Primavera experience 12 years – including P6 for the Web.

·   PM experience:

o   Boeing Aircraft

o   FAA – Engineering design

o   Fossil power – plant outages

o   Oil and gas – refinery turnarounds

o   Construction – industrial sites

o   Engineering – design, procurement, permitting

o   Federal Government projects

o   Transmission & Distribution, Substation planning

·   Specialty: schedule development and control.

·   Ability to take responsibility of project schedules.

 

SUMMARY

·   Able to use P6 Web and P6 Professional Client for scheduling

·   Worked with P&ID drawings and estimates

·   Have developed plans from Statements of Work (SOW).

·   Able to work with ANSI EIA-748B earned value criteria

·   Interest in PMI best practices

·   Cost and resource loading experience

·   Routinely build Gantt charts; logic ties, perform critical path analysis, fix negative float, id emergent issues, rework plans, and resource leveling

·   Experienced in enterprise project portfolios (EPS)

·   Can structure or change Primavera to meet the client needs

 

EXPERIENCE

 

Dec 2015 - -----Presently looking for next opportunity

 

04/2015- Nov 2015Pepco Holdings/Delmarva Power; Washington, DC

Transmission/Distribution/Substation Schedule development

·   Contracted thru System One Holdings, LLC

·    Substation Schedule Development In Pepco Engineering Department for Washington, DC T&D projects spanning multi-years.

·   Worked from templates to develop schedules and maintained updates.

·   Coordinated with engineering including permitting, procurement, and construction.

·   Supported four Project Supervisors and 15 Project Leads using a Portfolio approach.

·   Maintained cost and resources for each project. 

 

07/2014 – 11/2014Arizona Power Supply - Four Corners, NM

Fossil Plant Generating Station Outage Scheduler

·   Contracted thru Chicago Bridge & Iron

·   Planned 2014 Unit 4&5 Reliability Outages.

·   Utilized schedule tool: Primavera 6.0 Client & P6 for the web.

·   Master Scheduler for CB&I for the second time at the 4 Corners plant.

·   $15,000,000 plant outage consisting of typical fossil plant systems.

·   Completed two outages for two units back-to-back with one weekend between each.

·   Used APS Maximo data to develop Schedule while working closely with Planners and work order data.

·   Built templates to be used for future outages at other APS plants.

·   Mentored the lead planner to benefit the plant in the future.

 

11/13 -07/14Between Jobs & Waiting to Return to APS

 

06/2013 – 11/2013Worley Parsons Energy Services, LLC, Fountain Valley, CA

·   Contracted thru Peak Technical Services.

·   Developed a procurement schedule for a multi-year $220M oil field project in the San Andro, CA area for Aera Energy Corporation.

·   Utilized schedule tool: (Primavera 6.0 v.7)

·   Developed the procurement schedule to be later blended into the Aera master schedule.

·   Coordinated changes with Worley Parsons; and wrote procurement justification docs.

·   Configured the project specific WBS for use by the client for a future construction.

·   Used Excel and MS Project to interface with the client.

 

02/2013 – 05/2013Arizona Power Supply Four Corners, NM

·   Contracted thru Chicago Bridge & Iron

·   Utilized schedule tool Primavera 6.0

·   Developed schedule for the2013 Unit 1 APS Fossil Plant Outage using Maximo data.

·   Developed the structure for current and future outages.

·   Equipment consisted of typical fossil plant systems.

·   Suggested ways APS could better use Primavera at this site.

·   Performed critical path analysis, daily updates and look-ahead reports.

·   Maintained awareness of issues that could affect the “on-line” date.

·   Provided support to the daily turnover team.

·   Worked closely with APS planners and estimators on site.

·   Mentored my boss in P6 Primavera module.

 

11/2012 – 02/2013Navajo Refinery / Matrix Services: Artesia, NM

Turnaround Scheduler (Primavera 6.0)

·   2012 Regenerator Head Replacement Project

·   Capital expense project with estimated value approx. $10M.

·   Came on board to help with a Regenerator Head and Cyclone Replacement schedule – resource loaded/two shifts/7days-w.

·   Produced look-ahead reports; updated shift schedules; worked with master refinery scheduler to maintain their schedule.

·   Maintained a change log for Matrix.

·   Schedules developed in Primavera v 6.2 Client.

 

01/2011 – 03/2012Arizona Power Supply: Phoenix & Holbrook, AZ

Outage & Construction Primavera P6 Scheduler

·   Contracted with Day & Zimmerman, NPS for multiple small construction projects and 1 boiler outage.

·   Project values ranged from $20,000 to $3M: capital and maintenance

·   Set up the Primavera 6.2 structure.

·   Mentored my Project Manager in Primavera to the point he was able to plan with the tool.

·   Worked from estimates to build Capital and Maintenance schedules for 6 plants.

·   Developed resourced schedules to the point Primavera became the tool for submittals to APS.

·   Preformed walk-downs, updated, status, and informed management of issues through daily reports.

·   Used MS Project as an estimating tool as needed when working with others.

 

03/2010 – 11/2010Terra Nitrogen, Catoosa, OK

Turnaround Scheduler

·   Contracted thru Worldwide Turnaround Mgmt. Co, Houston, TX

·   Implemented Primavera 6.2 for a $15M bi-annual plant turnaround for equipment common to a nitrogen fertilizer plant.

·   Was the sole scheduler on site with oversight of the TA schedule.

·   Set up the structure, coding, layouts, to work with operations.

·   Worked from historical records to develop a three-week schedule.

·   Loaded resources for craft work and provided histograms for management.

·   Mentored my project manager during development to the point he could use the tool.

·   Updated twice daily, produced reports for shift-change meetings.

·   Tracked work orders, schedule variance, and earned value data within the schedule.

 

08/2008 – 04/2009ConocoPhillips Refinery / JVIC: Rodeo, CA

Turnaround Scheduler (Primavera 5.0)

·   Helped develop a Piping Schedule for a $50M for a Hydrocracker Expansion Project.

·   Worked closely with a Flour Construction Senior Scheduler for a resource-loaded schedule.

·   Developed logic; resource assignments; and leveled man-hours using ‘step-out sheets’ provided by Field Leads.

·   Tied piping tasks within the refinery master turnaround schedule.

·   Worked with Primavera v 5.0 and 6.0.

 

04/2008 – 08/2008Freeport McMoRan / Fluor Constructors: Bagdad, AZ

Mine Assessment Scheduler (MS Project)

·   Conveyor and Rock Crusher Mine Assessment Project, Bagdad, AZ

·   Project value approximately $5M.

·   Tasked with building conveyer and rock crusher schedules for a short-term project using MS Project.

·   Supported Assessment Engineers from Fluor.

·   Preformed functions of project-purchasing agent.

 

09/2007 – 04/2008BP Los Angeles Pipelines / Atkins Global: La Palma, CA

Piping Scheduler (Primavera 5.0)

·   Los Angeles Basin Underground Piping.

·   Worked with a 100 plus Portfolio of projects with values between $30K and $500K.

·   Maintained Level 2 management awareness of project status.

·   Refined the structure of Primavera 5.0 within the BP Pipelines LA office.

·   Developed the project EPS/WBS structure and codes.

 

02/2007 – 09/2007Exxon Mobil Refinery / Worldwide Turnaround Mgmt. Co: Torrance, CA

Maintenance Scheduler(Primavera 4.0)

·   Routine Refinery Unplanned Projects

·   2nd Refinery entry-level position resulting in increased knowledge of refinery operation.

·   Developed boiler related schedules for short-term outages with the intent of building a library of projects.

·   Worked with Primavera 4.0.

 

09/2005 – 02/2007Los Angeles Shell Refinery / Worley Parsons: Wilmington, CA

Capital Expense Entry Level Scheduler (Primavera 3.0 non-enterprise)

·   Capital expense projects between $25K to $300K.

·   Worked under a lead scheduler to build small capital and maintenance projects.

·   Maintained weekly updates, and reported to management in harmony with the lead scheduler.

·   Routine weekly updates to schedules

·   Worked with Primavera v 3.0.

 

2003 WA State Ferry System / Program Navigators; Seattle, WA

Engineering Scheduler (Primavera 4.0)

·   WA State Ferry Terminal Construction Projects

·   Schedule development for terminal upgrades ranging in size small to $400K

·   Schedules were oriented to Engineering efforts and weighed heavily on permitting.

·   Project timing was dependent on legislative approvals.

 

2003FAA / Apptis, Inc.: Washington, DC

Finance Analyst (Primavera 4.0)

·   FAA Standard Terminal Automation Replacement System (STARS).

·   $4B project passed by Congress to upgrade airport terminals across the US to improve flight safety.

·   Implemented and configured Primavera 4.0 while working with a database administrator.

·   Worked with one finance analyst to create the foundation for the program within Primavera.

 

1997-2002Boeing Aircraft – Everett, WA

Project Management Specialist II

·   Integrated Project Development Team for Boeing 777 Airplane.

·   Supported three teams of engineering staff.

·   Produced management reports on a weekly basis.

·   Maintained Level 3 schedule for this ‘entry level’ position.

·   Prior to Project Management at Boeing engineering - worked as a wing mechanic on the 777, 747, and 767 airplanes.

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Primavera P6 Scheduler

PEPCO Holdings / Delmarva Power

- Present

 

Additional Info

BACK TO TOP

 

Desired Salary/Wage:

105,000.00 - 115,000.00 USD yr

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

10+ to 15 Years

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Yes

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Primavera P6 Scheduler

Desired Job Type:

Employee
Temporary/Contract/Project

Desired Status:

Full-Time
Per Diem

 

Target Company:

Company Size:

Occupation:

Project/Program Management

·         General/Other: Project/Program Management

·         Program Management

·         Project Management

 

Target Locations:

Selected Locations:

US
US-CA-Los Angeles

Relocate:

Yes

Willingness to travel:

Up to 75% travel

 

Languages:

Languages

Proficiency Level

English

Advanced